E&I Work

GSRC POWER PLANT PROJECT

SCOPE OF WORK

 1) Installation of Auxiliary Transformer

 2) Installation of Electrical & Instrument for BOP per Block

  • Sump pit pump
  • Instrument Air compressor
  • Circulating water Filtration System
  • Purge Air compressor
  • Chlorine Dioxide dosing system

3) Installation of Electrical & Instrument for BOP Common (within BOP boundary only)

  • CCTV System
  • Communication System
  • Portable water System
  • Circulate water system
  • CW Chemical injection System
  • Plant fire detection and protection System
  • Water Treatment and Waste water treatment System
  • Area Lighting & Road Lighting

 4) Installation of M&E Building service work for Water treatment building and Laboratory building

 5) Installation of M&E Building Service for Central Control Building (CCB), Workshop & Warehouse Building and Guard house

 6) Install equipment inside Central Control Room include Cabinet, DCS operation, Console, Work station, Desk,          Computer, Printer etc.

 7) Above ground grounding work and connection to ground grid

 8) Assistant for commissioning

 9) Other

  • Supply and install Scaffolding (BS standard)
  • Non shrink grout